Clear answers.
Better project decisions.
Find practical answers across equipment selection, venue planning, customization, documentation, accessories and ongoing support.
All resources are listed below.
Choosing a system
What are the ball return and pinsetting times?
Ball return time: 12 seconds. Pinsetting time: 8.5–10 seconds. These values describe two separate equipment functions.
How do tenpin, mini and duckpin differ?
Start with your guest profile, playing experience and clear venue space. Tenpin is the conventional bowling format; mini offers a compact leisure experience; duckpin is a separate compact format with its own pins, balls and game options. Compare each complete system before selecting accessories or controls.
How many lanes can I compare in the planners?
The current planning tools offer 2–16 lanes for tenpin, 1–5 for mini and 1–12 for duckpin. These are the published planner ranges, not a statement of maximum manufacturing capacity. Send other requirements for a project-specific review.
What is the standard mini equipment length?
The standard mini equipment length is 11.82 m. The associated site planning length is 13 m. The equipment footprint and the room required for a usable venue are different measurements.
How much length does duckpin need?
The duckpin page lists 8.9 m equipment length and a 10 m minimum site length. Confirm width, lane count, access, circulation and other site requirements against the selected configuration.
Can tenpin and mini lengths be customized?
The tenpin planner lists 17.50–25.50 m equipment lengths in 800 mm steps. Mini lists 7.62–17.82 m in 600 mm steps. Discuss the intended playing experience and site allowance; a shortened layout is not automatically equivalent to a full-length competition lane.
Which game modes does duckpin offer?
The duckpin package presents Standard, Duckpin, Challenge and Practice modes. Use its product page to review the format and controls rather than applying modes from another bowling system.
Site & delivery
What finished clear height does mini require?
The mini gantry reaches 2,550 mm. The preferred finished clear height is 3,000–3,600 mm, with a normal minimum of 2,800 mm. A 2,600 mm theoretical fit needs a special technical review and is not a standard approved configuration. Measure below overhead services and obstructions.
What electrical power should I plan for?
The two-lane equipment reference is 4,000 W for tenpin and 3,000 W for mini or duckpin. Standard supply is 220 V, adaptable to destination grid requirements. Total power, including single or odd lane counts, circuit capacity and connections are confirmed in the project specification.
What should I prepare for an initial layout review?
Provide your country and city, a dimensioned floor plan, clear length, width and height, column locations, access routes, floor conditions and known utility constraints. Add your intended guests, preferred lane count and target opening date.
Is the online planner a construction drawing?
No. It compares the published equipment and planning dimensions. Final equipment positions, service access, circulation, structure and utilities require a project-specific layout and coordinated review.
Can SunEye support the project from survey to handover?
The project workflow covers site assessment, layout and design, equipment selection, manufacturing, packing and logistics, arrival checks, installation, commissioning, acceptance and operating support. Agree the responsibilities and included services in the project scope.
What is the production and delivery lead time?
Timing depends on the configuration, customization, order scope, manufacturing schedule, destination and site readiness. Share your target opening date and request a project schedule with the quotation. There is no single lead time that applies to every center.
How should I prepare for equipment arrival?
Review the packing list and agreed unloading arrangements, verify the access route and storage conditions, and confirm the site-readiness checklist with the project team. Record quantities and any visible shipping damage when receiving the goods.
Customization
Can the approach dimensions be adjusted?
Standard approach dimensions are the default configuration. Custom adjustments are supported where site structure permits and remain subject to the approved equipment layout, circulation and service access. Online planners use the default dimensions.
Which details can be customized?
Discuss the supported equipment length, lane configuration, finishes, venue branding, lighting, lane backgrounds, player areas and operating controls. Availability varies by system and must be confirmed for the chosen configuration.
Can I choose central or lane-side controls?
The tenpin page presents Master-Control, Stand-Alone and Dual-Control models. They address different front-desk and player workflows. Ask the team which options are available for your selected mini or duckpin configuration.
Are automatic bumpers and mini side railings the same product?
No. Automatic lane bumpers and mini side railings are distinct options. Confirm the bowling format, lane configuration and required function before selecting either item.
Can I provide my own branding or interior concept?
Yes, you can share reference images, color preferences, artwork and a venue concept for review. Agree the applicable surfaces, artwork requirements, finish samples and approval stages before production.
Documents & quotation
Which documents can I download immediately?
The download center includes the current English company and equipment overview PDF and data summary, and project inquiry checklists. Each entry identifies the file and its scope.
Do all certificates apply to every bowling configuration?
Use the model, holder and scope stated on the actual document. The equipment documents listed here concern YX-001. The USBC document concerns the named Jinmeijia Lane surface component; it is not approval of a complete bowling system.
Where can I obtain project drawings or an operating manual?
Request the document for your product, configuration and intended use. Provide your venue or order reference where available. Project drawings and model-specific operating information should match the equipment being supplied or serviced.
What should an equipment quotation define?
Specify the system, lane count and length, controls, displays, finishes, player equipment and accessories. Clarify packing, shipping, installation, commissioning, training and destination responsibilities so that both teams can review the same scope.
Does the website form send my message automatically?
After you choose Send enquiry, the form submits your details directly to SunEye. A reference confirms receipt. Email drawings, photos and other files separately to info@suneyebowling.com, quoting that reference. If online submission is unavailable, use the manual email option.
Operation & support
Where should my staff start learning about operation?
Use the Bowling User Guide for the published gameplay, scoring, setup and operating topics. Combine these resources with the instructions and training for the actual equipment installed at your venue.
Where can I find maintenance guidance?
The Maintenance & Care page organizes care schedules, cleaning, lane care, pin rope, pin replacement, lubrication and inspection topics. Follow the instructions applicable to your equipment and arrange qualified assistance for technical work.
What information helps with a support request?
Provide the venue and location, model, order or serial reference if known, the affected lane or component, the symptoms and when they occur. Include error messages, clear photos and a short video where useful.
What warranty and service arrangements apply?
Ask for the warranty, exclusions, spare-parts arrangements, remote assistance and any on-site service scope in your project agreement. These depend on the agreed supply and service terms.
Accessories
Can I request accessories without ordering a new center?
Yes. Use an individual accessory page for a specific item, or the catalog inquiry for several items. Include quantities, equipment references and specification notes so compatibility and supply can be confirmed.
Are pins and balls interchangeable between systems?
Do not assume they are interchangeable. Tenpin, mini and duckpin use their corresponding product specifications. Provide your exact bowling system and the required item when requesting a replacement or initial supply.
How should I specify house bowling shoes?
Choose the shoe model and provide a quantity breakdown by requested size. Confirm the sizing system, available colors and final supply specification with SunEye before placing the order.
How can I identify a replacement part?
Send a clear photo of the part and its position in the equipment, the model or serial reference, dimensions or markings if available, and the quantity required. Ask for compatibility confirmation before ordering.
No matching results. Try another keyword or reset the filters.
Need an answer for your project?
Share the product, venue and the information you need. Our team can review your specific configuration and project scope.

